The check before handover: the black column already fitted over the bath, the lit niche and the details that get gone over one by one.
The angle grinder marks the run of the plumbing on the wall. It is one of the dirtiest moments of a renovation and one of the most obvious if it is done badly.
A minute of real building work: the wall opened up, the setting out with the level and, at the end, the gold framed screen already fitted over the tray.
A walk through the bathroom as handed over: large-format porcelain, gold framed screen, black column and gold taps.
A walk through the bathroom as handed over: wooden unit with a countertop basin, close-coupled WC, towel radiator and sand-toned porcelain.
Plumbing in the floor, chases in the wall and the old tiling out. An ordinary day of the seven a bathroom renovation takes.
A walk through one of the completed jobs: screen over the bath, black column, backlit mirror and towel radiator.